期刊文献+

成都公路主枢纽总体布局规划后评价研究 被引量:2

Study on the Post-Evaluation for Chengdu Highway Main Hub General Planning
下载PDF
导出
摘要 结合成都公路主枢纽总体布局规划的特点与内容,从后评价的角度,按前后对比的系统思想,首次对公路主枢纽总体布局规划后评价进行了研究。并从发展预测、建设情况和运行机制3个主要方面对成都公路主枢纽总体布局规划的成功度进行了评价,为其实际操作提供了借鉴。同时,针对评价结果,从规划自身的角度出发,总结了规划成功的经验和失败的教训,为其修编提供参考与借鉴,以提高规划结果的科学性和合理性。 Based on characteristics and contents of the Chengdu highway main hub general planning, from the point of view of postevaluation and by comparison of before-after project, the authors discussed the highway main hub general planning post-evaluation theory. The rationality of the highway main hub general planning is evaluated from three main aspect of development prediction, construction condition and operation mechanism, which provide lessons for its operation actually.According to the result of the post-evaluation, successful experiences and failure lessons have been summarized from the planning itself that could be referenced in the adjustment of highway main hub general planning to make it more scientific and rational.
出处 《公路交通科技》 CAS CSCD 北大核心 2005年第9期163-166,174,共5页 Journal of Highway and Transportation Research and Development
关键词 交通工程 公路主枢纽 总体布局规划 后评价 Traffic engineering Highway main hub General planning Post-evaluation
  • 相关文献

参考文献4

二级参考文献13

共引文献46

同被引文献15

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部