期刊文献+

基于有向图的活动序列比较及其在装配序列评判中的应用 被引量:7

Comparison between Activity Sequences Based on Directed Graphand Its Applications to Evaluation Assembly Sequences
下载PDF
导出
摘要 在分析活动序列内涵的基础上,提出了用于描述活动序列及评价指标参考序列的两个模型———完全AOV网和扩展AOV网,给出了一种基于有向图的活动序列相似度的计算方法,实现了工程任务安排决策中活动序列方案对各评价指标满足程度的量化计算。在装配序列规划中的应用实例表明,该方法较好地解决了工程任务安排决策中方案的自动评价与选择问题。 On the basis of introducing model of completed AOV--net and extended AOV--net for representation of activ graph was presented, ity sequences, a comparison method among activity sequences based on directed which can be used to calculate the degree that activity sequences meet the requirements of evaluation factors. To show the effectiveness of the method,a case study was finally given for evaluating assembly sequences.
机构地区 南京理工大学
出处 《中国机械工程》 EI CAS CSCD 北大核心 2005年第19期1733-1737,共5页 China Mechanical Engineering
基金 国防"十五"预研资助项目(41318.1.1.2) 江苏省高技术研究计划资助项目(BG2002004)
关键词 序列比较 序列评价 有向图 AOV网 装配序列优化 sequence comparison sequence evaluation directed graph AOV-net assembly sequence optimization
  • 相关文献

参考文献6

  • 1李磊,魏生民,张军波.装配序列的模糊综合评价[J].中国机械工程,2003,14(18):1606-1609. 被引量:18
  • 2布斯劳G 德赫斯特P 耐特W 王知衍译.面向制造与装配的产品设计[M].北京:机械工业出版社,1999..
  • 3付宜利,田立中,储林波.基于模糊评判的装配序列生成[J].哈尔滨工业大学学报,2002,34(6):739-742. 被引量:13
  • 4Rohrdanz F, Mosemann H, Wahl F M. Constraint Evaluation for Assembly Sequence Planning. IEEE International Symposium on Assembly and Task Planning, Marina del Rey, California, 1997.
  • 5王孝义,张友良,张帆.装配序列评价研究[J].中国机械工程,2005,16(13):1165-1169. 被引量:18
  • 6Bonneville F, Perrard C, Henrioud J M. A Genetic Algorithm to Generate and Evaluate Assembly Plans. IEEE Symposium on Emerging Technology and Factory Automation, Paris, 1995.

二级参考文献12

  • 1梁樑,盛昭翰,徐南荣.一种改进的层次分析法[J].系统工程,1989,7(3):5-7. 被引量:73
  • 2马玉林 储林波 等.机器人装配规划的自动生成[J].机器人,1998,20:177-180.
  • 3Homem de Mello L S,Sanderson A C. Evaluation and Selection of Assembly Plans. Proceedings of the IEEE 1990 International Conference on Robotics and Automation, Cincinnati, Ohio, USA,1990.
  • 4de Mello L S H. Two Criteria for the Selection of Assembly Plans: Maximizing the Flexibility of Sequencing the Assembly Tasks and Minimizing the Assembly Time through Parallel Execution of Assembly Tasks. IEEE Trans. on Robotics and Automation,1993, 17(5): 626~633.
  • 5Cegkarek D J. Multivariate Analysis and Evaluation of Adaptive Sheet Metal Assembly System.Annals of the CIRP, 1998, 47(1):7~22.
  • 6Rohrdanz F, Mosemann H,Wahl F M. Constraint Evaluation for Assembly Sequence Planning. Proceedings of 1997 IEEE International Symposium on Assembly and Task Planning, Marina del Rey ,California, 1997.
  • 7Gottipolu R B, Ghosh K. A Simplified and Efficient Representation for Evaluation and Selection of Assembly Sequences. Computers in Industry, 2003,50(3):251-264.
  • 8Dini G, Failli F, Lazzerini B, et al. Generation of Optimized Assembly Sequences Using Genetic Algorithms. Annals of the CIRP,International Institution for Production Engineering Research, 1999,48(1):17-20.
  • 9Lazzerini B, Marcelloni F. A Genetic Algorithm for Generation Optimal Assembly Plans. Artificial Intelligence in Engineering,2000,14(4):319-329.
  • 10Jones R E, Wilson R H,Calton T L. On Constraints in Assembly Planning. IEEE Transactions on Robotics and Automation, 1998,14(6):849-863.

共引文献37

同被引文献48

引证文献7

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部