期刊文献+

西龙池抽水蓄能电站输水系统大坡度超长斜井开挖施工中的难点及对策

The Conundrum and Countermeasures in Construction of Excavating Over Length Inclined Shaft With High-gradient Conduit System in Xilongchi Pumped-storage Power Station
下载PDF
导出
摘要 本文针对西龙池抽水蓄能电站输水系统大坡度超长斜井开挖的施工难点进行了研讨,提出了解决的措施及对策,保证了工程的顺利进行. In accordance with the conundrum in construction of excavating over length inclined shaft with. high-gradient conduit system in Xilongchi Pumped-storage Power Station, a discussion has been made and some efficiency countermeasures have been presented, so that ensured the construction smooth advance.
作者 姬脉兴 Ji MaiXing
出处 《西北水力发电》 2005年第3期57-60,共4页 Journal of Northwest Hydroelectric Power
关键词 西龙池电站 输水系统 大坡度超长斜井 措施 对策 Xilongchi Pumped-storage Power Station conduit system over length inclined shaft with high gradient measure countermeasure
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部