本文针对西龙池抽水蓄能电站输水系统大坡度超长斜井开挖的施工难点进行了研讨,提出了解决的措施及对策,保证了工程的顺利进行.
In accordance with the conundrum in construction of excavating over length inclined shaft with. high-gradient conduit system in Xilongchi Pumped-storage Power Station, a discussion has been made and some efficiency countermeasures have been presented, so that ensured the construction smooth advance.