用先进的项目管理方法来运作造纸废水处理工程

To run the papermaking effluent treatment project with advanced project management measures
下载PDF
导出
摘要 本文将目前国际上先进的项目管理理念引入造纸废水处理工程,有效地解决了进度、费用和质量三者的冲突,达到了三个要素的协调与优化,避免了不必要的资金浪费和不必要的工期延长。用一个工程实例来说明,通过项目管理可以得到一个高质量的造纸废水处理系统。 Tbe internationally advanced project management conception was introduced in the papermaking effluent treatment project, the conflict among schedule, expenses and quality was effectively tackled and the harmony and optimization of the three elements were achieved. The unnecessary wasting of fund and prolonging of construction period were avoided. The case study of the project illustrates that a high quality papermaking effluent processing system can be obtained through project management.
出处 《中华纸业》 CAS 北大核心 2005年第10期27-31,共5页 China Pulp & Paper Industry
关键词 项目管理 造纸 废水处理 工程 协调 优化 project management papermaking effluent effluent treatment harmony optimization