摘要
根据矿山生产规模与矿山设备生产能力之间的关系,运用整数规划,以年采剥总量对每一工艺环节主体设备的年折算费用最小为优化目标,对高村铁矿采、装、运三环节的主体设备进行优化配置,使采场生产取得相对较优的经营效果。
In accordance with the relationship between mine production scale and equipment capacity by applying integer planning and with the least of annual conversion cost of the annual total stripping and mining amount to the main equipment in each technological link as the objective of optimization, the configuration optimization was made of the main equipment in the mining, loading and hauling links in Gaocun Iron Mine, leading to a relatively excellent operation result in the open-pit production.
出处
《金属矿山》
CAS
北大核心
2005年第10期27-29,共3页
Metal Mine