通过模型试验对黄河小北干流连伯滩放淤试验工程的各关键技术分别进行了分析。分析表明,采用将放淤闸布设在弯道上段的凹岸、弯道设置溢流堰、淤沙条渠的合理分区和科学调度等措施,可以实现试验工程淤粗排细的目标。
The key techniques for the Liarrbotan experimental warping project of the lower north main-stem of Yellow River are analyzed through the model test concerned respectively. The analysis show that the project target of detaining the coarse and discharging the fine can be got with the related measures, such as placement of the warping sluice on the concave bank of a bending reach; arrangement of the overflow weir on a bending reach and reasonable zoning and scientific control of the desilting channels etc.
出处
《水利水电技术》
CSCD
北大核心
2005年第10期50-52,66,共4页
Water Resources and Hydropower Engineering
关键词
黄河小北干流
引洪放淤
淤粗排细
模型试验
lower north main-stem of Yellow River
flood diversion for warping
detaining the coarse and discharging the fine