浅谈黄河小北干流放淤试验工程关键技术 被引量:1

Discussion on key techniques for experimental warping project of lower north main-stem of Yellow River
下载PDF
导出
摘要 通过模型试验对黄河小北干流连伯滩放淤试验工程的各关键技术分别进行了分析。分析表明,采用将放淤闸布设在弯道上段的凹岸、弯道设置溢流堰、淤沙条渠的合理分区和科学调度等措施,可以实现试验工程淤粗排细的目标。 The key techniques for the Liarrbotan experimental warping project of the lower north main-stem of Yellow River are analyzed through the model test concerned respectively. The analysis show that the project target of detaining the coarse and discharging the fine can be got with the related measures, such as placement of the warping sluice on the concave bank of a bending reach; arrangement of the overflow weir on a bending reach and reasonable zoning and scientific control of the desilting channels etc.
出处 《水利水电技术》 CSCD 北大核心 2005年第10期50-52,66,共4页 Water Resources and Hydropower Engineering
关键词 黄河小北干流 引洪放淤 淤粗排细 模型试验 lower north main-stem of Yellow River flood diversion for warping detaining the coarse and discharging the fine model test
  • 相关文献

参考文献2

  • 1王德昌 宋莉萱.黄河小北干流放淤试验工程引水闸引沙效果试验研究[R].黄河水利科学研究院,2004..
  • 2武彩萍 林秀芝.小北干流连伯滩放淤试验工程淤区实体模型试验研究[R].黄河水利科学研究院,2004..

同被引文献3

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部