乌江索风营水电站坝址区分布有7个堆积体,其成因有崩塌堆积、蠕变—拉裂—崩解堆积、塌滑堆积及混和堆积等。在勘察过程中我们采用了地质测绘、钻探、硐探、物探、科研试验等多种勘察方法与手段,在勘察成果基础上对堆积体稳定性进行了分析,并结合对工程的不同影响提出了相应的工程处理措施。
There are seven accumulated bodies at the dam site of Sboufengying Hydroelectric Station on Wujiang River of which the origins are collapsing, creeping, cracking, crumbling ,sliding and the intermixing of them. The stabilities of the accumulations are analyzed by means of geological survey, drilling, exploratory adit, geophysical exploration and scientific research test etc. and then the relevant engineering treatments for various of the accumulations on the project are put forward as well.
出处
《地球与环境》
CAS
CSCD
北大核心
2005年第B10期523-530,共8页
Earth and Environment
关键词
堆积体
物质组成与成因分析
勘察方法与手段
稳定分析
工程处理前言
accumulation body
physical makeup
origin analysis
reconnaissance method
stability analysis
engineering treatment