对索风营水电站坝址区堆积体勘察设计的几点认识 被引量:1

VIEWPOINTS ON INVESTIGATION AND DESIGN OF ACCUMULATED BODIES AT SITE OF SITE OF SUOFENGYING HYDROPOWER STATION
下载PDF
导出
摘要 乌江索风营水电站坝址区分布有7个堆积体,其成因有崩塌堆积、蠕变—拉裂—崩解堆积、塌滑堆积及混和堆积等。在勘察过程中我们采用了地质测绘、钻探、硐探、物探、科研试验等多种勘察方法与手段,在勘察成果基础上对堆积体稳定性进行了分析,并结合对工程的不同影响提出了相应的工程处理措施。 There are seven accumulated bodies at the dam site of Sboufengying Hydroelectric Station on Wujiang River of which the origins are collapsing, creeping, cracking, crumbling ,sliding and the intermixing of them. The stabilities of the accumulations are analyzed by means of geological survey, drilling, exploratory adit, geophysical exploration and scientific research test etc. and then the relevant engineering treatments for various of the accumulations on the project are put forward as well.
出处 《地球与环境》 CAS CSCD 北大核心 2005年第B10期523-530,共8页 Earth and Environment
关键词 堆积体 物质组成与成因分析 勘察方法与手段 稳定分析 工程处理前言 accumulation body physical makeup origin analysis reconnaissance method stability analysis engineering treatment
  • 相关文献

同被引文献13

引证文献1

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部