摘要 介绍了苏丹6区外输管道尼罗河定向钻干线穿越施工技术,对管道穿越施工中出现的问题从工程地质概况、管道穿越线路、管道的承压能力、地下打孔的孔径以及施工等方面进行了分析,提出了解决的办法,并对今后的类似工程提出了建议。 This paper introduces the technology of horizontal direction drilling to cross over the Nile for the 6th Oil-Producing Area Pipeline of Sudan. The analysis on the problem existed in two cross-over operation is made in the geological condition, cross-over route of pipeline, loading capacity of pipeline, determination of bore diameter of drilling and drilling procedure. The method to solve the technical problem is presented.
出处 《油气储运》 CAS 北大核心 2005年第10期40-43,共4页 Oil & Gas Storage and Transportation
关键词 定向钻 反向折角 扩孔 三维图象 穿越技术 原油管道 尼罗河 苏丹 管道穿越施工 施工技术 crude oil pipeline, horizontal direction drilling technology, application
  • 相关文献

同被引文献25

  • 1梁伟,高德彬,周义.某输油管道线路工程地质问题及其防治[J].山西建筑,2005,31(4):59-60. 被引量:2
  • 2朱波,吕建峰,张永高.管道水平定向钻穿越技术的特征分析[J].油气储运,2005,24(3):51-54. 被引量:11
  • 3赵忠刚,姚安林,赵学芬,张俊良.长输管道地质灾害的类型、防控措施和预测方法[J].石油工程建设,2006,32(1):7-12. 被引量:47
  • 4HUEY D P,HAIR J D,MCLEOD K B.Installation loading and stress analysis involved with pipelines installed in horizontal directional drilling:International No-dig 1996 Conf.,New Orleans,Mar.31-Apr.3,1996[C].Chicago:North American Society for Trenchless Technology,c1996.
  • 5BAMERT M E,ALLOUCHE E N.Methods for estimating pipe pullback loads for horizontal directional drilling (HDD) crossings[J].Journal of Infrastructure Systems,2002,8(1):12-19.
  • 6ASTM Standard.ASTM F 1962-05,2005,Standard guide for the use of maxi-horizontal directional drilling for placement of polyethylene pipe or conduit under obstacles,including river crossings[S].West Conshohocken:ASTM International,2005.
  • 7CHENG E,POLAK M A.Theoretical model for calculating pulling loads for pipes in horizontal directional drilling[J].Tunnelling and Underground Space Technology,2007,22(5/6):633-643.
  • 8ARIARATNAM S T,BOTTEICHER R,GHOSH A,et al.Predictive modeling of installation loads for directional drilled fusible PVC pipe[J].Tunnelling and Underground Space Technology,2010,25(6):766-772.
  • 9POLAK M A,CHU D.Pulling loads for polyethylene pipes in horizontal directional drilling:theoretical modeling and parametric study[J].Journal of Infrastructure Systems,2005,11(2):142-150.
  • 10POLAK M A,LASHEEN A.Mechanical modeling for pipes in horizontal directional drilling[J].Tunnelling and Underground Space Technology,2002,16(sup 1):47-55.

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部