期刊文献+

热电(冷)联产系统运行调节的双目标规划 被引量:7

Bi-objective programming for operation strategy of CCHP plants
下载PDF
导出
摘要 针对热电(冷)联产系统的运行调节问题建立了包含经济性和节能要求的双目标规划模型,根据热、电、冷负荷的全年变化提出了合理的运行模式和运行方案,探讨了经济性和节能要求的权重变化对总目标函数的影响,分析了分时电价、燃料价格对系统运行策略的影响。 Aiming at the operation strategy of CCHP plants, establishes a bi-objective programming model to minimize both the annual running cost and the annual primary energy consumption. Presents the reasonable operation modes and schemes according to the annual cooling, heating and power load. Explores the influence of the change of economic weight and energy consumption weight on total objective function. Analyses the influence of the natural gas cost and the hourly rate of purchased electric power on the operation strategy.
出处 《暖通空调》 北大核心 2005年第10期1-4,共4页 Heating Ventilating & Air Conditioning
关键词 热电联产 热电冷联产 运行策略 双目标规划 双目标规划模型 运行调节 系统 联产 热电 运行方案 目标函数 分时电价 运行策略 combined heating and power, combined cooling heating and power, operation strategy, biobjective programming
  • 相关文献

参考文献7

  • 1张蓓红,龙惟定.热电(冷)联产系统优化配置研究[J].暖通空调,2005,35(4):1-4. 被引量:24
  • 2Casella F, Maffezzoni C, Piroddi L, et al. Minimising production costs in generation and cogeneration plants.Control Engineering Practice, 2001,9(3): 283 - 295
  • 3Dag Henning. Cost minimization for a local utility through CHP, heat storage and load management.International Journal of Energy Research, 1998,22
  • 4Gunnel Sundberg, Dag Henning. Investments in combined heat and power plants: influence of fuel price on cost minimised operation. Energy Conversion and Management, 2002,43: 639 - 650
  • 5Yokoyama R, Ito K. Multi-objective optimization in unit sizing of a gas turbine cogeneration plant.Transactions of the ASME, 1995, 117
  • 6Jose Antonio Perrella Balestieri, Paulo De Barros Correia. Multiobjective linear model for pre-feasibility design of cogeneration systems. Energy, 1997, 22(5)
  • 7潘毅群,黄治钟,张蓓红,周辉,龙惟定,王超群,蔡浩.分布式供能系统在上海某新建医院应用的可行性研究[J].暖通空调,2004,34(2):68-72. 被引量:6

二级参考文献16

  • 1<建筑电气设计手册>编写组.建筑电气设计手册.北京:中国建筑工业出版社,1997
  • 2Willis H Lee, Walter G Scott. Distributed power generation: planning and evaluation. Marcel Dekker, Inc, 2000
  • 3Gard Analysis, Assessing combined cooling, heating and power systems in Northeast Wisconsin. Energy Center of Wisconsin, 2000
  • 4Crawley Drury B,Linda K Lawria, Frederick C Winkelmann, et al. EnergyPlus: creating a new-generation building energy simulation program. Energy and Buildings, 2001,33(4)
  • 5EDUCOGEN. The European Educational Tool on Cogeneration. 2nd. 2001
  • 6Horii S, Ito K, Pak P S, et al. Optimal planning of gas turbine eogeneration plants based on mixed-integer linear programming. International Journal of Energy Research, 1987(11): 507- 518
  • 7Yokoyama R, Ito K, Matsumoto Y. Optimal sizing of a gas turbine cogeneration plant in consideration of its operational strategy. In: Transactions of the ASME.1994, 116(1). 32-38
  • 8Casella F, Maffezzoni C, Piroddi L, et al. Minimizing production costs in generation and cogeneration plants.Control Engineering Practice, 2001, 9.. 283-295
  • 9Sundberg G, Henning D. Investments in combined heat and power plants: influence of fuel price on cost minimized operation. Energy Conversion and Management, 2002, 43: 639-650
  • 10EDUCOGEN. The European Educational Tool on Cogeneration. 2nd. 2001

共引文献27

同被引文献52

引证文献7

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部