摘要 倒垂线是大坝位移监测的主要设施之一,常与引张线和正垂装置配合使用,具有较高的监测精度。石泉水电站于1998年开始实施大坝监测系统自动化改造工程。大坝规划设置5条坝顶倒垂线。倒垂孔施工过程中,对钻孔及纠偏,孔斜检测,保护管安装及埋设,锚块、垂线安装及埋设,浮体组安装等,均采取了严格的技术措施;对坝左倒垂孔孔斜偏差超标提出了有效的解决办法,实施效果良好,保证了倒垂孔的安装精度。 The reversed pendent hole is one of primary methods in dam displacement monitoring by means of cooperating with tensional line and the perpendicular device. The automation rehabilitation project of Shiquan dam monitoring system was put into practice in 1998. Five reversed pendent holes were arranged in Shiquan dam. In the course of constructing reversed pendent hole, the strict measures were used in boring hole, surveying degree of inclined line, correcting its error, and installing protective steel tube, anchor, the line of perpendicular, and buoy. The effective method of correcting lean super-scale in left reversed pendent hole was brought forward. The results were satisfactory, and the installing precision of reversed pendent hole was ensured.
出处 《水力发电》 北大核心 2005年第9期39-41,57,共4页 Water Power
关键词 混凝土坝观测 倒垂孔 施工技术 石泉水电站 石泉大坝 技术探讨 施工过程 坝顶 安装精度 系统自动化 concrete dam observation reversed pendent hole construction technique Shiquan Hydropower Station
  • 相关文献

参考文献3

  • 1西北电力试验研究院.石泉水电站大坝引张线、正倒垂线自动化观测技施设计图[R].,1998..
  • 2西北电力试验研究院.石泉水电站大坝监测系统完善化更新改造总体规划[R].,1998..
  • 3DL/T5178—2003.混凝土大坝监测技术规范[S].[S].,..