从新制度经济学的视角,说明代建制是一种政府主导的外在制度安排。水利公益性项目引入代建制是一种制度变迁过程,政府职能的转变、交易成本的减少、制度需求主体的变化,是水利公益性项目引入代建制的动力源。对水利公益性项目实行代建制的关键问题进行了分析。
Viewed from New Institutional Economics, this paper puts forward that the Agent Construction Management (ACM) is a kind of outside institutional arrangement under the government predominance. The application of ACM for water public-spirited project is a process of institutional change. The shift of government functions, the reduction of transaction costs, and the change of main institutional demand bodies are the motive sources of introducing ACM to water public-spirited project. Finally, this paper analyzes some key problems of implementing ACM.
出处
《水力发电》
北大核心
2005年第9期58-61,共4页
Water Power
关键词
新制度经济学
水利公益性项目
代建制
关键问题
new institutional economics
water resource public-spirited project
agent construction management
key problems