摘要
基于某铝厂氢氧化铝储运这一工艺的改进,展开对储仓结构形式的探讨,结合工艺流程、工程状况,先从大框架出发,逐步分析结构特点,确定最佳方案,就其最佳方案———扶壁式挡墙进行设计、计算。
The article discusses how to optimize storage strucure design along with Al(OH)3 storage and handling process improvements made in one alumina refinery. With reference to process flow and engineering conditions, it analyzes in steps the structure characteristics in terms of the framework and determines optimum program - counterfort retaining wall.
出处
《轻金属》
CSCD
北大核心
2005年第10期73-75,共3页
Light Metals
关键词
工艺改进
结构选型
受力分析
挡墙设计
process improvement
structure selection
stress analysis
retaining wall.