某重型工业厂房的抽柱改造设计 被引量:2

Column-removed Retrofit Design of an One-storey Workship in Heavy Factory
下载PDF
导出
摘要 介绍了某单层工业厂房抽柱改造的设计内容,包括柱子的粘钢加固、托架的设计、柱间支撑的移位与施工工序安排等,包含了从工程实际出发的一些独特处理。该方案使得改造在不破坏屋顶维护结构的情况下在短时间内得以实施,最大程度地减少了施工工作量。实践证明加固方案合理、经济,可为同类设计参考。 A column of a one-storey factory is removed. The reconstruction content is introduced, including the column reinforcement by bonded steel, the joist design, the column brace remove and the construction procedure arrangement. Some special treatments are included which can provide some experience for similar design. The scheme can shorten the construction period as well as reduce workload sharply, under the conditions of no destroying the roof. Practice proves that the scheme is reasonable and economical.
出处 《建筑结构》 CSCD 北大核心 2005年第10期38-40,共3页 Building Structure
关键词 抽柱 托架 加固 粘钢 植筋 单层工业厂房 改造设计 抽柱改造 重型 设计内容 column-removed joist strengthening bonded steel planted steel bar
  • 相关文献

参考文献4

  • 1.建筑抗震设计规范(GBJ11—89)[M].北京:中国建筑工业出版社,..
  • 2.混凝土结构加固技术规范(CECS25:90)[M].中国计划出版社,1992..
  • 3.建筑结构荷载规范(GBJ9—87)[M].北京:中国计划出版社,1989..
  • 4.钢结构设计规范(GBJ17-88)[M].北京:中国计划出版社,1989..