摘要 针对桩基工程室内配合比抗压强度低以及在试桩过程中出现的桩体水泥不凝固问题,结合地基土及地表水、地下水检测参数,经掺外加剂室内配合比试验以及现场试桩,得出了适应现场地质条件的桩基施工方法,为类似地质条件下的桩基施工提供了参考。 Due to low compression strength of indoor mixing ratio and unsetting cement of pile body during pile driving test, and based on the examination parameters for foundation soil, surface water and groundwater, the pile foundation construction method adaptable to the field geological condition was obtained by making the test for indoor mixing ratio which was blended with additive and the field pile driving test. It provided reference for the pile foundation construction under the similar geological condition.
作者 陈杰
出处 《中国给水排水》 CAS CSCD 北大核心 2005年第11期104-106,共3页 China Water & Wastewater
关键词 搅拌桩 配合比 干法 湿法 粉煤灰 pile by mixing soil with cement mixing ratio dry method wet method powdered coal ash
  • 相关文献

参考文献1

  • 1王吉望 王伟堂 石振华.地基处理手册(第2版)[M].北京:中国建筑工业出版社,2000..

同被引文献2

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部