3Schonfeld P, Chien S. Optimal Work Zone Lengths for Two-Lane Highways Maintenance Projects [ J ]. Journal of Transportation Engineering. 2002, 128(2): 145-155.
4Khattak A J, Khattak A J, Forrest M. Effects of Work Zone Presence on Injury and Non-injury Crashes [J]. Accident Analysis & Prevention. 2002, 34(1): 19-29.