拦河坝砼防渗墙多在砂层与砂卵石层上施工。地基处理根据地质条件选择,施工方法有无导孔挖槽、导孔挖槽、冲击成槽、回转钻成槽、锯槽机成槽。锯槽机为新型防渗成墙材料提供了新的施工手段,但有局限性。
The seepage cut -off wall for the river-crossing dam is usually installed in the sand and the sandy gravel. The dam site treatment depends on the geological conditions and the construction methods include trench-cutting without pilot hole, trench-cutting with pilot hole, percussive trenching, rotsry trenching and trenching by trench saw. The trench saw provides a new construction method for the new seepage cut-off walling material, but has its limitation.
出处
《探矿工程》
1996年第5期46-48,共3页
Exploration Engineering(Drilling & Tunneling)
关键词
防渗墙
锯槽机
拦河坝
混凝土防渗墙
seepage cut-off wall trench-cutting method trench saw bottom cleaning concreting