摘要
简要介绍同煤集团四老沟矿大采高工作面超前电缆及管路拖曳导向移动装置设计制造和实施情况,为今后综采工作面超前电缆及管路移动管理提供借鉴意义。
The paper introduces the design, manufacture and implementing situation of the leading cable and hose towing director motion devices in the working face of Datong Coal Mine Group Silaogou Mine to mine the full coal height once and offer some suggestion for reference to administrate the leading cable and hose towing director motion devices for the future.
出处
《煤炭技术》
CAS
2005年第10期17-18,共2页
Coal Technology
关键词
超前
拖曳
导向移动
leading
towing
director motion