期刊文献+

建设项目的可行性研究与项目评估 被引量:5

Feasibility study and assessment of construction project
下载PDF
导出
摘要 介绍了可行性研究和项目评估的定义、基本内容、工作程序以及目的、作用等,对加强中国石化建设项目前期管理、规范相应管理程序、确保项目科学决策具有一定的参考作用。 Construction projects commonly have 4 stages including design, development, construction and building and putting into production. This process is called ' project development cycle'. Feasibility study and project assessment hold the balance in project development cycle. This paper introduces the definitions, basic contents, job program, targets and functions of feasibility study and project assessment. It is hoped to provide some references for preceding management, normalization of corresponding management program and ensuring scientific decision -making of the construction projects of SINOPEC.
出处 《河南石油》 2005年第5期92-94,共3页 Henan Petroleum
关键词 建设项目 可行性研究 项目评估 分析 论证 construction project, feasibility study, project assessment, analysis, demonstration
  • 相关文献

参考文献2

  • 1咨询工程师教育丛书编写组.建设项目咨询工程师实物知识手册[S].[S].北京:中国计划出版社,2003..
  • 2国家计划委员会 建设部.建设项目经济评价方法与参数[S].[S].北京:中国计划出版社,1995..

同被引文献14

  • 1付晶晶,汪泱.我国可行性研究现状及评价方法改进[J].化工技术经济,2005,23(2):28-31. 被引量:8
  • 2张玮.可行性研究在项目建设中的作用[J].中国科技信息,2005(11):134-134. 被引量:2
  • 3张煜.重视建设项目可行性研究阶段的投资估算工作[J].粮食流通技术,2007(2):44-45. 被引量:4
  • 4国家计划委员会,建设部.建设项目经济评价方法与参数[M].北京:中国计划出版社,2006.
  • 5Achkire :, Preumont A. Flutter control of cable-stayed bridges [C]//Proc.2nd Eacwe. Genova, Italy, 1997.
  • 6Miyata T, Yamada H, Dung N, et al. Proposed measures for flutter control inlong span beidges [C]//Proc.15th Congress IABSE. Copenhagen, Denmark, 1996.
  • 7ANSI/PMI 99-001-2004. A guide to the project management body of knowledge (PMBOK Guide) [C]//Project Management Institute, USA, 2004.
  • 8咨询工程师教育丛书编写组.建设项目咨询工程师实务知识手册[S].北京:中国计划出版社,2003.
  • 9全国注册咨询工程师(投资)执业资格管理委员会.项目组织和管理[M].北京:中国计划出版社,2011.
  • 10中华人民共和国国家发展和改革委员会.关于发布项目申请报告通用文本的通知[Z].北京,2007,5.

引证文献5

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部