摘要
阐明港口煤炭货源计划手工管理的弊端,指出计算机管理势在必行。设计的系统由年度计划、月份计划、基本信息、辅助功能等四个子系统组成,给出了模块结构图,并对各个模块实现的功能进行了较详细的论述。
Clarified the malpractice of coat source plan handwork management in port, and pointed out that the computer management is imperative. The design system is composed of annual program,monthly plan,basic information and auxiliary function etc. four sub-systems,and has given out the module construction diagram, and the detailed description each module to implement function.
出处
《世界海运》
2005年第5期32-34,共3页
World Shipping
关键词
货源计划
原提吨数
权限管理
经营户
作业委托人
good source plan
previously carry tonnage
popedom management
operator
task consigner