摘要
针对房柱法开采后形成了大量采空区,随时间推移,矿柱的岩体强度下降,采空区面积增大造成部分矿柱因应力转移而使载荷增加,在外力作用下矿柱发生连锁垮塌,大面积顶板在较短时间内冒落,所产生的冲击气浪冲垮设备、设施,造成人员伤亡。本文建立了采空区大面积顶板冒落造成的冲击气浪的最大速度预测模型。
a great number of worked - out section area were formed after a gypsum mine was mined in the form of pillar- room, with the time passing, the rock strength of jamb builds down. The load of a great number of jambs increases by reason of stress transferring while worked - out section area expands, jambs break down due to external force, and great extent of top layer falls down in short time, which makes air in worked - out section area be compresed sharply and engenders airflow that will burst fixture and hurt people. The paper builds the top speed prediction modal of airflow which is engendered due to weighting over great extent.
出处
《化工矿物与加工》
CAS
北大核心
2005年第11期9-11,共3页
Industrial Minerals & Processing
关键词
大面积顶板冒落
地下开采
冲击气浪
风速
weighting over great extent
undergrourd mining
airflow