基于合作对策的工程进度协调问题研究 被引量:7

Study on harmony of project construction processes based on cooperative game theory
下载PDF
导出
摘要 做好工程进度协调工作对于保证/缩短工期、降低工程造价具有重大意义.分析工程进度协调的本质,建立了工程进度优化的数学模型,重点在于建立了工程进度协调的合作对策模型,并利用Shapley值方法对合作利益进行分配.该模型为促进各方最大限度合作、公平合理分配合作利益提供了理论依据和操作规则,进而促进各方的合作、协调施工进度,最终利于缩短工期、降低造价、提高施工企业竞争力. Solving these problems successfully pays much impact on guaranteeing or shortening project duration and reducing project cost. The paper analyzes the problem of harmony of project construction processes, constitutes the mathematical model for project construction processes optimization. More importantly, a mathematical model for harmony of project construction processes is constituted based on cooperative game theory; and the cooperative benefit is distributed by Shapley value method. The model provides theoretical background and manipulation rules for cooperation in harmony of project construction processes. And it promotes cooperation among construction corporations, distributes cooperative benefit fairly and reasonably. Finally, the model shortens project duration, reduces project cost and improves competitive capacity of construction corporations.
出处 《武汉大学学报(工学版)》 CAS CSCD 北大核心 2005年第5期1-5,共5页 Engineering Journal of Wuhan University
基金 国家自然科学基金资助项目(69874029) 湖北省自然科学基金资助项目(2001ABB047)
关键词 工程进度 进度协调 施工管理 合作对策 SHAPLEY值法 project process harmony of construction process construction management cooperativegame Shapley value method
  • 相关文献

参考文献10

二级参考文献8

共引文献58

同被引文献53

引证文献7

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部