摘要
本文利用塔器设计计算程序,通过适当的结构转换,对南充炼油厂15万t/a催化裂化装置中的1600/2400×60000钢烟囱进行了强度及稳定计算,从而在满足工程要求的前提下,大大提高了钢烟囱设计计算的合理性及计算效率,并通过建立一系列假设,对钢烟囱热力计算进行了有益的探讨,为今后此类不规则设备的全面计算提供了可循依据。
Strength and reliability of 1600/ 2400×60000 steel stack of catalytic cracking Plant with capacity of 15×10 ̄4 t/a in Nanchong Refinery is calculsted using calculating procedures for tower with appropriate structural conversion,This can not only meet engineering requirements, but also greatly increase reasonableness and efficiency of design calculation of steel stark.The article meaningfully discusses thermodynamic calculation and provides a followable base for overall calculation of similar irregular facilitied.
出处
《天然气与石油》
1996年第1期44-49,共6页
Natural Gas and Oil
关键词
炼油厂
催化裂化
钢结构
烟囱
设计
计算
Oil refinery
Catalytic cracking
Steel structure
Stack
Design
Calculation