6Dumn S.G. et al.. Study of Bitumen Recovery by Gravity Drainage Using Low Temperature Soluble Gas Injection. Canadian Journal of Chemical Enjineering 1989, 67(2).
7Jiang Q,Butler R. M.. Selection of Well Configurations in Vapex Process. SPE 37145.
8Greaves Met al. Horizontal producer wells in in-- situ combustion (ISC) processes. JCPT, 1993;32(4).