摘要
简要地介绍了解决灵山矿提升能力不足的三种方案及实施条件,其中方案三还同时解决了双罐对罐问题。
The paper mainly introduces 3 best plans to settle problems of lifting ability in Lingshan Mine as well as their implementing conditions. The 3rd plan also gets rid of the prob1em of coal tubs in level.
出处
《化工生产与技术》
CAS
1996年第1期44-50,共7页
Chemical Production and Technology
关键词
提升容器
罐笼
竖井
矿井提升
Lingshan Mine, lifting ability, double coal tubs in level