摘要
介绍了洛阳石化总厂催化裂化装置大型机组控制系统技术升级改造情况,针对Tricon TS3000控制系统在机组运行过程出现的问题进行分析和改进,保证了机组的长周期安全运行与控制。
The control system technology upgrade and improvement on large-style machine units is introduced at catalytic cracking unit of LuoYangPetrochemical Complex. The text analyzes and solves problems on TS3000 control system in the machine units operating,this ensures themachine units long-cycle safety operating.
出处
《石油化工自动化》
CAS
2005年第5期68-70,72,共4页
Automation in Petro-chemical Industry
关键词
主风机
冗余容错系统
防喘振控制线
电源配置
air compressor
redundancy and tolerance-error
anti-surge controlline
power configuration