摘要
在昱岭关隧道的施工中,运用控制爆破的基本原理,成功地进行了隧道通过古文物石长城的爆破设计,使古文物石长城未受任何损失,完整地保持了原貌。设计方案对类似工程具有一定的指导意义。
In the construction of Yu Ling Guan tunnel, the blasting method is successfully designed in case of the tunnel drilling through the old cultural relics of stone city-wall using the basic principle of controlled blasting. The old stone city-wall has been completely protected and suffered no damage. There would be some guilding meaning of this design method to some other similar construction.
出处
《地下空间与工程学报》
CSCD
2005年第5期759-760,764,共3页
Chinese Journal of Underground Space and Engineering
关键词
隧道施工
文物保护
控制爆破
tunnel construction
cultural relics protection
controlled blasting