摘要 提出附加调蓄量的概念,采用附加滩地断面积的方法模拟附加调蓄量,使河道水流系统的蓄量等价于水库的实际蓄量.通过反分析方法确定区间入流过程,应用具有附加滩地的河道水流系统模拟水库调洪系统.通过四点线性隐格式求解河道水流方程,建立水库动库容的分析方法,并成功地应用于水口水库的洪水演进模拟,得到了静库容方法与动库容方法推算入库流量的误差.计算结果表明,本文方法是可行的,可以应用于工程实际. A concept of additional storage capacity was introduced and simulated with the additional cross section area of river beach, so that the storage capacity of the river system is equal to the real storage capacity of the reservoir system. In this study, the reverse analysis method was usedto determine the inflow process, and the river system with additional cross section area was applied to simulation of the reservoir flood routing system. By solution of the river flow equation with four-point linear implicit scheme, a reservoir backwater storage analytic method was established. The method was applied to flood routing for the Shuikou Reservoir, and the difference of inflow discharges calculated by backwater storage capacity and static storage capacity was obtained. The result shows that the method is reliable and can be applied to engineering.
出处 《水利水电科技进展》 CSCD 北大核心 2005年第5期9-11,67,共4页 Advances in Science and Technology of Water Resources
关键词 动库容 水库洪水 水口水库 backwater storage reservoir flood Shuikou Reservoir
  • 相关文献

参考文献3

二级参考文献7

共引文献24

同被引文献79

引证文献13

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部