摘要
国际工程报价不同于国内项目或援外项目报价,其人工、材料单价及机械台班单价等,更多地需要从当地调查获得第一手资料,而且采用定额的工料机的消耗量也会产生变化。此文探讨如何利用国内现有定额的消耗量,在国际工程投标中迅速进行工料机用量分析和单价计算。
The quotation for international projects differs from those for domestic and foreign - aid projects. The first -hand information for labour, material unit price and rating per machine team mostly needs to be obtained from the local investigation, and the consumption of labour, materials and machines adopting the norms will be likely to change as well. This article is written to explore how to make use of the consumption of the current norms at home to quickly perform the quantitative analysis and unit price computation of the labour, materials and machines in international bidding for engineering projects.
出处
《铁路工程造价管理》
2005年第5期52-55,共4页
Railway Engineering Cost Management
关键词
国际工程
投标
工料机消耗
工料机费用
计算
International project
bid
cost of labour
materials and machines
norm utilization