摘要 电厂主要建筑物荷载较大,大多需采用人工地基,地基处理的主要依据是试桩,受各方面因素制约,目前部分试桩工程中存在一些问题。本文针对如何优化试桩方案、提高试桩效果进行了研究和分析,目的是确保工程桩施工顺利、缩短施工工期、最大限度地降低地基处理费用。 The artificial foundation is mostly adopted in the main building of electric power because its carries is bigger. The main basis of foundation treatment is pile testing. And now there are some problems in pile testing engineering because of many factors. On how to optimize scheme and increase the effect of pile testing, analysis is proceeded in this paper, in order to insure the construction smooth, shorten the construction period, and lower the foundation treatment expenses with biggest limit.
出处 《电力勘测设计》 2005年第5期28-31,共4页 Electric Power Survey & Design
关键词 试桩效果 地基处理 问题分析 the effect of pile testingl foundation treatment problem analysis
  • 相关文献

参考文献2

  • 1JGJ94-94.建筑桩基技术规范.[S].,..
  • 2JGJ79-2002 J220—2002.建筑地基处理技术规范.[S].,..

共引文献271

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部