期刊文献+

基于AHP的工程承包风险模糊综合评价 被引量:13

AHP Based Fuzzy Comprehensive Evaluation of Bid Risk
下载PDF
导出
摘要 施工企业工程承包潜藏着众多风险,在投标时采用有效的方法对工程承包风险进行准确分析,可以提高投标决策效率,进而提高工程效益。投标活动是定性、定量的多指标决策过程。在充分研究承包风险因素的基础上,提出基于层次分析法的工程承包风险的模糊综合评判模型,即将层次分析法和模糊综合评价法相结合用于工程承包风险分析评价。通过实例演示了操作过程,证明该方法的科学性和可行性。 Bid of construction enterprise is a decision-making activity involves many nature and quality indexes. It can improve the bid efficiency and the construction benefit to analyze the bid risk accurately by taking effective method. A new method was put forward to make an evaluation of bid risk based on the full analysis of the bid risk in this test. The method combines AHP and fuzzy comprehensive evaluation to make a fuzzy comprehensive evaluation of bid risk. It reflects the policymaker's subjective purpose as well as reflected objective information. It offered the comprehensive appraisal method nature and quality combine together for project bid risk. A case was applied to qualify its scientificalness and feasibility.
出处 《建筑管理现代化》 2005年第5期9-12,共4页 Construction Management Modernization
关键词 施工企业 工程承包 承包风险 层次分析法(AHP) 模糊综合评价 construction enterprise engineering contract risk AHP fuzzy comprehensive evaluation
  • 相关文献

参考文献5

二级参考文献18

  • 1许树柏.层次分析法--一种简易的新决策方法[M].北京:科学出版社,1986.117-135.
  • 2王众托.系统工程引论[M].北京:电子工业出版社,1994..
  • 3许树伯.实用决策方法--层次分析法原理[M].天津大学出版社,1988..
  • 4[美]托马斯L萨迪.领导者:面临挑战与选择--层次分析法在决策中的应用[M].,1993..
  • 5[美]T L 萨蒂.层次分析法--在资源分配、管理和冲突分析中的应用[M].,1988..
  • 6RogerFlanagan.工程建设风险管理[M].北京:中国建筑工业出版社,2000..
  • 7何万金 田元福.建设工程项目管理基础[M].兰州:兰州大学出版社,2002..
  • 8Yao M,J Syst Eng Electronics,1997年,8卷,1期,57页
  • 9汪培庄,模糊系统理论与模糊计算机,1996年
  • 10姚敏,系统工程理论与实践,1994年,14卷,8期,18页

共引文献396

同被引文献91

引证文献13

二级引证文献99

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部