山西省万家寨引黄工程南干二级泵站施工技术

Construction Technique of Secondary Pumping Station in South Main Line of Wanjiazhai YRDP of Shanxi Province
下载PDF
导出
摘要 文中通过万家寨引黄南干二级泵站国家重点工程项目的施工过程概述及泵站厂房、副厂房、控制楼、变电站、进水压力埋涵、进水池、出水压力钢管、出水压力平洞、出水竖井及闸门井等主要建筑物施工,重点介绍了南干二级泵站、导流施工,主副厂房进水池、进出水压力钢管及出水压力平洞开挖钢结构安装及混凝土施工工艺。 The project of secondary pumping station in south main line of Wanjiazhai YRDP is composed of following works: machine hall, auxiliary plant, control building, transfermer station, buried inlet pressure culvert, receiving basin, outlet steel penstock, outlet pressure adit, outlet shaft and gate shaft~ This paper emphatically introduces the construction technique of the pumping station, diversion during construction, receiving basin, inlet and outlet steel penstock, the cutting of outlet pressure adit and the installing of steel structure.
出处 《山西水利科技》 2005年第4期44-46,54,共4页 Shanxi Hydrotechnics
关键词 引黄南干二级泵站 导流 开挖 钢结构安装 混凝土施工 secondary pumping station of south main line of YRDP diversion cutting installing of steel structure construction of concrete
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部