人字抱杆与汽车吊吊装PCCP管道施工在引黄联接段工程中的比较

On Comparision Between A-framed Derrick and Crane Truck Used for Installation of PCCP in Connection Works of YRDP
下载PDF
导出
摘要 引黄PCCP管道安装具有管道长(单节管长5.0m)、管径大(管径3.0m)、重量大(单节管重约28t)的特点,安装起来不方便。本文通过对人字抱杆和汽车吊吊装PCCP管道这两种施工方法对比介绍,详细阐述了PCCP管道从平板车吊入沟槽的方法,PCCP管道在沟槽中承插对接安装工艺,以及PCCP管道打压合格后管道分层回填。 The PCCP works in connection works of YRDP have following features: long length of each PCCP(5 m), big diameter(3 m) and heavy weight of each length of PCCP(25 t). So that installation is not easy and convenient. This paper introduces the comparison between A-framed derrick and crane truck used for installation of PCCP. The detailed introduction is put forward about craning PCCP from platform trailer to trench, installing two length of PCCP with bell and spigot joint in trench and completing bedded earthfill after bulge test of PCCP.
作者 李全禄
出处 《山西水利科技》 2005年第4期49-51,共3页 Shanxi Hydrotechnics
关键词 人字抱杆 预应力钢筒混凝土管 引黄联接段工程 A-framed derrick PCCP connection works of YRDP
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部