摘要
The construction engineering of Qinghai-Tibet railway is formidable but magnificent with very complicated geological conditions, facing “three difficult problems" of permafrost, severe coldness & oxygen deficiency and fragile ecology. All of the working staff stick to human foremost principle, upgrade construction concept, realize the management innovation, implement the legal person responsibility system for construction project, form the management system featuring in the integration of quality-environment-occupational health & safety, optimize project organization & coordination system and establish the complete & rigorous construction target system. Tackle the difficulty of permafrost relying on science and technology and the finished roadbed, bridges and tunnels are in stable condition. Carry out the basic national policies and protect geological environment, being the leading position in the construction of important and key construction projects and of demonstration significance. Insist on human foremost principle and guarantee the occupational health, creating the altitude medical miracle of “zero death of high-altitude disease, zero occurring of SARS and zero spread of plague". The construction also advances and implements “three specific requirements", that is, the train passes the plateau in fast speed, high-reliable and less maintenance of operation equipment and minimum management staff of the line.
The construction engineering of Qinghai-Tibet railway is fonnidahle but magnificent with very complicated geological conditions, facing “three difficult problems” of permafrost, severe coldness & oxygen deficiency and fragile ecology. All of the working staff stick to human foremost principle, upgrade construction concept, realize the management innovation, implement the legal person responsibility system for construction project, form the management system featuring in the integration of quality-environment-occupational health & safety, optimize project organization & coordination s.vstem and establish the complete & rigorous construction target system. Tackle the difficuhty of permafrost relying on science and technology and the finished roadbed, bridges and tunnels are in stable condition. Carry. out the basic national policies and protect geological environment, being the leading position in the construction of important and key construction projects and of demonstration significance. Insist on human foremost principle and guarantee the occupational health, creating the altitude medical miracle of “zero death of high-ahitude disease, zero occurring of SARS and zero spread of plague”. The construction also advances and implements “three specific requirements”, that is, the train passes the plateau in fast speed, high-reliable and less maintenance of operation equipment and minimum management staff of the line.
关键词
青藏铁路
高原铁路
建筑工程
施工技术
地质勘探
construction of Qinghai-Tihet Railway
management and technological innovation
tackling “three diffieuh problems”