摘要
以汾离高速公路填石路堤为例,通过对填石路堤松铺厚度、压实遍数、压实机械、行驶速度等影响压实质量的因素进行了分析,得出了较合理的施工工艺及压实质量控制的方法。
The paper analyzed the factors of influencing compaction quality from several aspects, and concluded the reasonable construction technology and the method of compaction quality control.
出处
《山西交通科技》
2005年第A01期32-33,36,共3页
Shanxi Science & Technology of Transportation
关键词
填石路堤
压实
标准
质量
方法
fill subgrade
compaction
standard
quality
method