摘要
根据三峡电站建设后我国电力系统将发展成多区域联网的趋势,提出多区城电力系统联网规划模型.该模型可以同时考虑多个电力系统联网的有关问题,进行联合大系统的整体优化.还阐述了多区域联网规划的目标函数、约束条件及求解思路.对模型主要子模块作了扼要的说明,最后对模型应用作了介绍.
Because the development tendency after the Three Gorge twdro Power Saution installed iS for several region electric Power systems to the united electric Power systems, an optimal model for planning of interconnection between multiregion electric Power systems is presented in this paper. This model can simultaneously consider the problems related to the interconnection between multiregion electric power systems and can optimize the united electric Power system integrally. This Paper expounds the objective function,constraint conditions and solution thinking for multi-region interconnection planning.The main submodels in the planning model are briefly stated.The real application for the model is indicated in the end.
出处
《水电能源科学》
北大核心
1996年第2期93-99,共7页
Water Resources and Power
基金
三峡工程"八五"攻关成果
关键词
水电站
多区域联网
电力网
优化模型
multi-region interconnect,interconnect benefit, Planning model for interconnection, interconnected network