摘要
“N+1”改造后,有关出发进路末端道岔区段漏解锁问题的探讨。
Discussion on missing release of switch section at the end of departure route after “N+1” reconstruction is presented in the article.
出处
《铁路通信信号工程技术》
2005年第5期15-16,23,共3页
Railway Signalling & Communication Engineering