数值模拟结果表明,用充填法开采水平、缓倾斜中厚矿体时,当采空区规模超过了一定范围后,留设盘区矿柱明显地减小了顶板围岩中导水裂缝带的最大发育高度,并且使得最大潜在导水裂缝的发育形态也发生了变化,这些结论对矿山的安全生产,具有重要的指导作用.
In this paper, a numerical simulation method is used to investigate the development of water-con-ducting fissure zone in overlying strata resulting from the extraction of horizontal or gently dippingmedium thickness orebody under water with back-filling. The results show that the maximum devel-oping height of actual presented zone decreases, and the developing shape of latent zone varies bymeans of being arranged panel barrier when the extracting 8cale develops to a certain extent. The con-clusions will play important role in guiding the mine safe production.
出处
《中国矿业》
1996年第1期30-33,共4页
China Mining Magazine
基金
中国有色金属工业总公司高校科研基金
关键词
充填采矿
盘区矿柱
导水裂缝
数值模拟
顶板
Back-filling method, Panel barrier, Water-conducting fissure, Numerical simulation