三峡链子崖危岩体锚固工程施工方案 被引量:3

CONSTRUCTING PROGRAMME ON PRE-STRESSED CABLE OF "WUWANFANG" DANGEROUS ROCKMASS OF LIANZIYA, THE THREE GORGES
下载PDF
导出
摘要 本文介绍了链子崖危岩体治理重点单元一"五万方"危岩体预应力锚索加固工程施工方案。在锚固设计中,推荐了1000kN、2000kN和3000kN三种预应力锚索,并给定了相应的锚索参数和施工方案。五万方危岩体现今稳定性极差,因此,锚索的张拉顺序及锁定锚固力的大小关系到锚固工程的成败,本文对这一问题进行了探讨。 The controlling engineering for the Lianziya Dangerous Rockmass in the Three Gorges of the Yangtze River have been conducted. The paper introduces constructing programme of the dangerous rockmass controlling and the anchoring engineering. For the key part of the rockmass, called 'Wuwargfang' dangerous rockmass, the anchoring is divided into eight zones and about 200 cables are fixed of 1000kN, 2000kN and 3000kN. The cable parameters are designed, and the technique and monitoring programme are recommended.
出处 《中国地质灾害与防治学报》 CSCD 1996年第1期44-51,共8页 The Chinese Journal of Geological Hazard and Control
关键词 危岩体 锚索加固 坝址 滑坡 施工方案 Lianziya dangerous rockmass, pre-stressed anchoring. cable technique.geo-engineering design
  • 相关文献

参考文献3

二级参考文献3

共引文献1

同被引文献21

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部