期刊文献+

宽尾墩联合消能工在我国的发展(续) 被引量:13

Development of Flaring Gate Piers in China
下载PDF
导出
摘要 宽尾墩联合消能工在我国的发展(续)谢省宗,李世琴,李桂芬(中国水利水电科学研究院北京100038)(上续本刊1995年第3期第11页)2.3安康河床三中孔的宽尾域——折流域——短消力池联合消能工2·3·1流动特征和消能机理安康河床三中孔孔口尺寸11m... The dissipator equipped with flaring gate piers (FGP) is Innovated in China in 1974. It has beenflourishing in China in recent twenty years. This paper reviews the history of development for tile Innovation,namely FGP incorporated dissipators, Summarizes the experiments on the techtllque of FGP. which forms 3 D contracted jets at gate piers tail. They will dissipate energy alone or jointly with different conventional gatepiers dissipators, skip-jump, stilling basin, bucket basin, and surface dissipation as well. The flow characterist dissipation mechanism and effect of the FGP incorporated dissipators are also discribed. Several problems onthe technique about FGP incorporated dissipators are discusse and its further development are forecasted.
出处 《红水河》 1996年第1期24-31,共8页 Hongshui River
关键词 消能工 宽尾墩 流动特征 水力学 flaring gate piers, incorporated dissipators, ski-jump, stilling basin, bucket basin
  • 相关文献

同被引文献118

引证文献13

二级引证文献102

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部