摘要 鄱阳湖人工控制后,因抬高主湖区的年平均水位,湖域水流、泥沙的运行将发生变化,湖盆淤积加快;三峡工程实施运行后,五河主要排沙期的长江水位又将受三峡调节影响,有所抬升.这些对湖区排沙都不利,淤积加速,淤积后果将比原预估的要严重.针对这种情况提出了消除其负作用的设想. After Poyang Lake is controled by man, the year even water level of the main Lake region was built up, the operation of the Lak water and silt is going to take variation, the Lake deposit fast. After the Three Gorges engineering operates, the Changjiang water level of five rivers' main desilting will be influenced by the Three Gorges' adjustment and will lift a little. This is unfavourable to the region desilting. It result to deposit fast. The depositing result will be more serious than orginal forecast. The author put forward the tentative idea to clear up the negative action to this condition.
作者 王若庚
出处 《江西水利科技》 1996年第1期49-56,共8页 Jiangxi Hydraulic Science & Technology
关键词 鄱阳湖 泥沙淤积 人工控制 Poyang Lake Man control Silt depositing Influence forecast
  • 相关文献

同被引文献17

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部