钻孔灌注桩排渣泥浆流速的计算 被引量:2

Calculation of Up Speed Rate of Cutting Removal for Bored Piles
下载PDF
导出
摘要 针对目前钻孔灌注桩施工时,在确定冲孔方案时没有定量分析,往往造成排渣不净,沉渣过多的现象,结合实例,介绍了冲孔排渣泥浆流速计算的方法。 In current bored pile drilling, the cutting in borehole is not be able to clean up efficiently and there is excessive settled cutting due to lacking of quantitative analysis on determination of borehole cleaning up. Aiming to resolved this kind of problems, calculation methods of cutting removal speed rate were introduced, taking the actual cases as samples.
出处 《探矿工程(岩土钻掘工程)》 2005年第B09期67-68,共2页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 钻孔灌注桩 泥浆流速 排渣 bored piles mud speed rate cutting removal