摘要
小湾水电站引水发电系统建筑物规模宏大,初步设计中分别对进水口、压力管道、地下洞室的布置和结构型式进行了深入地研究。
The scale of deversion systen is broad in Xiaowan Hydropower Station. At the preliminary design stage, a thorough research is made about the layout and structural forms of the intakes, penstocks and underground cavities,then,an appropriate deaign program is put forward.
出处
《云南水力发电》
1996年第1期67-70,共4页
Yunnan Water Power
关键词
水电站
引水建筑物
进水口
压力管道
发电系统
Xiaowan Hydropower Station, intake, penstock, underground powerhouse