小湾水电站地下厂房跨度大,吊车吨位大,在国内首屈一指.本文对吊车梁型式:岩壁式、岩台式作了详细的计算、分析、论证,最后确定采用吊车梁型式.
Xiaowan Hydropower Station is particular to its underground powerhoue with long span and heavy crane,they come first on the list nationwide. This paper deals with the caculation,analysis, and verification of crane beams including two types of rock-panel and rock-bench,type of crane beam is determined at last.
出处
《云南水力发电》
1996年第1期71-75,共5页
Yunnan Water Power
关键词
水电站
地下式厂房
吊车梁
岩壁
设计
Xiaowan Hydropower Station,crane beam of type rock-panel,crane beam of type rock-bench, stability of rock