摘要
分析了大体积混凝土施工中裂缝的形成原因及温度应力的影响,介绍了温度的控制及防止裂缝的措施,论述了混凝土早期养护的必要性,以避免混凝土裂缝的出现。
It analyzes cause of temperature cracks of mass concrete construction and effect of temperature stress, introduces temperature control and prevention measures for cracks, and discusses necessity of maintenance in early stage to avoid concrete crack.
出处
《山西建筑》
2005年第21期156-157,共2页
Shanxi Architecture
关键词
混凝土
温度应力
早期养护
concrete, temperature stress, maintenance in early stage