Max-npv项目进度问题研究评述 被引量:23

A Survey of Max-npv Project Scheduling Problems
下载PDF
导出
摘要 首先介绍了不受资源约束Max-npv项目进度问题在模型和算法方面的研究进展;随后,根据资源约束类型的不同,对可更新、不可更新及双重资源约束Max-npv项目进度问题的研究成果,特别是优化算法和启发式算法的设计进行了概述;最后,对Max-npv项目进度问题的研究现状进行了总结并指出进一步的研究方向。 The models and algorithms developed for resource-unconstrained max-npv problems are presented firstly. Then according to the type of resource constraints, the fruits of the researches on renewable, nonrenewable, and doubly constrained resource-constrained max-npv problems, especially the design of optimal and heuristic algorithms, are discussed respectively. Ultimately, the author summarizes the developments of max-npv project scheduling problems and indicates several directions for further research.
出处 《管理工程学报》 CSSCI 2005年第4期60-63,共4页 Journal of Industrial Engineering and Engineering Management
基金 国家自然科学基金重大项目(59990470-4) 山西省软科学研究项目(031047-4)
关键词 净现金值 项目进度安排 模型 优化算法 启发式算法 net present value project scheduling model optimal algorithm heuristic algorithm
  • 相关文献

参考文献26

  • 1Russell A H. Cash flows in networks[J]. Management Science, 1970,16(5) :357 ~ 373.
  • 2Grinold R C. The payment scheduling problem [J]. Naval Research Logistics Quarterly, 1972,19(1): 123 ~ 136.
  • 3Elmaghraby S E, Herroelen W. The scheduling of activities to maximize the net present value of projects [J]. European Journal of Operational Research, 1990,49: 35 ~ 49.
  • 4Herroelen W, Gallens E. Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects[J]. European Journal of Operational Research, 1993,65: 274 ~ 277.
  • 5Demuelemeester E, Herroelen W, Van D P. An optimal recursive search procedure for the deterministic unconstrained max-npv project scheduling problem. Technical Report, Katholieke University, 1996.
  • 6Sepil C, Kazaz B. Project scheduling with discounted cash flows and progress payments. Working Paper, Middle East Technical University,1994.
  • 7Smith-Daniels D E. Summary measures for predicting the net present value of a project. Working Paper, College of St. Thomas, 1986.
  • 8Buss A H, Rosenblatt M J. Activity delay in stochastic project networks. Working Paper, Washington University, 1993.
  • 9汪嘉旻,孙永广,吴宗鑫.时间和费用具有不确定性的优化进度计划[J].系统工程理论与实践,2002,22(1):93-98. 被引量:17
  • 10Yang K K, Talbot F B, Patterson J H. Scheduling a project to maximize its net present value: an integer programming approach [J]. European Journal of Operational Research, 1992,64: 188~198.

二级参考文献2

共引文献16

同被引文献228

引证文献23

二级引证文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部