摘要
现今越来越多的火电机组并入电网运行,这就要求机组协调控制系统能够满足AGC的要求,本文综述了影响火电机组负荷响应速度的主要因素及提高响应速度的途径。
Now more and more fossil-fired generating units have operated on-line, which demands that the coordinated control system of units must meet automatic generation control. This paper surveys the main factors of influencing the load response speed of fossil-fired generating units and the methods of improving the load response speed.
出处
《仪器仪表用户》
2005年第6期3-5,共3页
Instrumentation
关键词
火电机组
自动发电控制(AGC)
协调控制
fossil-fired unit, automatic generation control (AGC),coordinated control system