利用优化理论和CAD技术,建立了从排土场位置确定、排土设备选型、货流优化分配到排土场合理工作参数确定等排土规划的计算机方法。应用于海南铁矿排土规划,可节省运输费20%。
A computer method was developed for waste dumping programming for open-pit mines on the basis of the optimization theory and CAD technique. This method involves the location of waste dumps, selection of waste dumping equipment, optimun assignment of material flow,the establishment of reasonable operating parameters for waste dumps,etc.and has been applied to the dumping programming for Hainan Iron Mine, thus resulting in a 20 percent saving in transportation work.