摘要
推行工程量清单计价办法的改革是一项复杂的系统工程。此文结合推行工程量清单计价改革的实践,针对相关配套体系建设中存在的不足,对实施工程量清单计价相关政策、机制和环境等方面的建设进行研究探讨,并提出具体的完善与改进的措施和建议。
The implementation of the method of charging by bill of quantities is a complicated system engineering. In combination with the practice of the charging reform by bill of quantities, this article makes a study and exploration of the building of policies, mechanism and environment in relation to charging by bill of quantities based on the insufficiency of the related complementary system, and brings forth specific measures and proposals to improve and perfect the system.
出处
《铁路工程造价管理》
2005年第6期28-30,共3页
Railway Engineering Cost Management
关键词
清单计价
配套机制
建设
措施
Charge by bill of quantities
complementary mechanism
building
measure