以秦沈线为例,阐述了单枕法一次铺设无缝线路施工工艺中基地焊接长钢轨、长钢轨存放、铺设底碴、铺轨、工地焊接、应力放散及锁定的工艺流程和注意事项。
Taking the Qin - Shen line for example, this article gives a description of the technological process of welding & storage of continuous rails in the base, bottom ballast installation, track - laying, field welding, stress release and fastening down of rails and precautions for the construction of one - time CWR track laying on monoblock concrete sleepers