摘要
香港迪士尼工程开工前,制定项目环保计划,通过对环境影响的评估,制定出相应的措施,以尽量减少施工过程对环境造成的影响。工程施工过程中,采取了防止水污染、空气污染、噪声污染、废物污染,以及保护生态环境、节省能源和资源的措施,定期进行审核,取得了良好的效果。
Environmental protection plan was enacted before works commencement of Hong Kong Disneyland Project. Through assessment of environmental impact, corresponding measures were set out to minimize the adverse effect during construction. During construction period, precautionary measures for water pollution, air pollution, sound pollution, waste pollution, ecology enviromnent, energy saving, material saving and environmental audit were adopted.
出处
《施工技术》
CAS
北大核心
2005年第11期9-11,共3页
Construction Technology
关键词
迪士尼工程
环保计划
环保措施
审核
Disneyland construction project
environmental protection plan
environmental protection measure
audit